Production Manager:
I had cycle time problems due to downtime in tool changes and loading parts. In order to have all machining processed on the part I had to tool different machines.
Now I load the part on the free pallet, while the units are machining.
The positive results are a considerable reduction of production times, precision and reduction of set up times.
Eng. Marco Stradiotti
Production Manager
KRAMER ITALIA S.r.l.
Via Matteotti 1 – 13864 Crevacuore (BI)
Italy